Methane Gas Capping System for Lagoon Wastewater Treatment Facilities

small description

Project Details

paid Budget : 5234$
paid Raised : 5234$
person Donors : 34
location_on Location : Marakkech, Morocco

Description

The 2018-2019 Environmental Engineering Capstone Project focused on designing a methane gas capping system for the wastewater treatment anaerobic ponds. The potential use of the methane can be for the new pottery kiln prototypes or for household use. A prototype small-batch reactor is in the process of being designed to verify the cubic meters of methane produced and determine the best gas scrubbing process.


Water and Sanitation
Energy

Documents

For further information about this project, check the following documents

Partners

Our Partners regarding this project

Partners & Collaborators

Our Past Partners